HK Stocks
About pre-opening
What is the P/E ratio and P/B ratio
Why isn't China Unicom an AH share
What is the market volatility regulation mechanism (VCM)
What is the closing auction trading period (CAS)
Quote card related
Rules for naming stock short names (HK stocks)
Why the latest price of Hong Kong stocks is not equal to the latest transaction price
Hong Kong stocks advanced overall market (SF) introduction
Whether the opening price is the first transaction of the stock-market rules
What is Hong Kong stock LV2 and the Hong Kong BMP
Market description of HK options
HKEX BMP description
US Stocks
ADRs
Options
Funds
Futures
Japanese Stocks
Singapore Stocks
Malaysian Stocks
Stock Connect
Index
The closing bidding trading period (CAS) is divided into four stages from 16:00 to 16:10: the reference price pricing period (1 minute), the input trading time (5 minutes), the irrevocable period (2 minutes), and the random closing time (2 minutes).
[Reference price pricing (16:00 to 16:01)]
Reference price: calculation and publication
Order modification: cannot enter, cancel and change
[Enter order period (16:01 to 16:06)]
Price limit: ±5% of the reference price
Order type: At-auction order, At-auction limit order
Order modification: input, cancel and change
[Irrevocable period (16:06 to 16:08)]
Price limit: between the lowest selling price and the maximum
Order type: At-auction order, At-auction limit order
Order modification: input, cancel and change
[Random closing time (16:08 to 16:10)]
Price limit: between the lowest selling price and the maximum
Order type: At-auction order, At-auction limit order
Order modification: input, cancel and change
Note: The actual closing time is randomly determined by the system.
[Phase I]
1. Major index components: the Hang Seng Composite large Stock Index and the Hang Seng medium-sized Stock Index, with H shares corresponding to A shares;
2. All exchange-traded funds.
[Phase II] (currently applicable)
1. The list of securities was expanded to include stocks in the Hang Seng Composite Index;
2. The second stage includes the scope of application of the first stage.